Documents

The Belene chronology is updated

25. 11. 2009

This fact sheet was developed by Greenpeace in cooperation with WISE Brno and the BeleNE! coalition.

Seizmic risks in the Belene Nuclear Power Project

6. 3. 2008

In this fact sheet, you will find three original documents concerning the seismic risks of the Belene nuclear power plant (Belene NPP) project. Two of them date from the original planning phase of the nuclear power station and conclude that the Belene site is unsuitable, the last one from the Environmental Impact Assessment (EIA) of the current attempt to construction of the Belene NPP concludes the contrary.

Seismic risks in the Belene Nuclear Power Project

28. 6. 2007

Petko Kovachev – Green Policy Institute, Sofia
Jan Haverkamp – Greenpeace

In this fact sheet, you will find three original documents concerning the seismic risks of the Belene nuclear power plant (Belene NPP) project. Two of them date from the original planning phase of the nuclear power station and conclude that the Belene site is unsuitable, the last one from the Environmental Impact Assessment (EIA) of the current attempt to construction of the Belene NPP concludes the contrary.

A short Belene chronology

28. 5. 2007

1981 – The Bulgarian Government decides to build six nuclear power stations of the VVER
1000/320 design near the town of Belene in North Bulgaria.
1985 – First work on the Belene Nuclear Power Station starts.

Greenpeace: Comments on the EIA scoping documentation of Cernavoda

25. 10. 2006

This report consists of an analysis of the scoping documentation for the Environmental Impact Assessment (EIA) made available to the non-Romanian speaking public on the website of the Romanian Ministry of Environment.
(PDF)

1 | 2 | 3 | 4 | »